VACUUBRAND MZ 2C NT +AK+M+D User Manual
Page 63
page 63 of 74
Pump at pump support:
➨
Assemble catchpots (9) with joint clips.
➨
Put head cover cowling on.
➨
Slide the head cover cowling in the grooves
of the caps (I) and under the connection
fasteners (Q).
➨
Install the washers. Use a Torx driver T20 to
attach the 4 screws holding the head cover
cowling.
➨
Tighten the fillister head screws (L) of the
connection fasteners (Q) with a Torx driver
T20.
➨
Close the hinged covers.
Affix the connection tube (V) to the other side
of the pump at the valve head (O).
Pump on pump support:
Affix the connection tube (V) to the other side
of the pump, as well as the hose connection to
the inlet or outlet of the vacuum system at the
valve head (O).
➨
Slip connecting tube (V) onto hose connection of valve head.
➨
Slide on the tube and the hose clip (U) until touching the nose at the
valve head.
➨
Close hose clip (U) with flat pliers.
I
Q
Replace diaphragms and valves of the opposite side of
the pump in the same way!