Maintenance and repair, Notice – VACUUBRAND MZ 2C NT +AK+M+D User Manual
Page 19
page 19 of 74
Check the liquid level in the catchpots regularly and drain
condensate in time to prevent overfilling. Install a level
sensor (see ”Accessories”, pg. 48) for monitoring, if
necessary.
Provide appropriate protective measures to allow for the
possibility of failure and
malfunction. The protective mea-
sures must also allow for the requirements of the respec-
tive application.
In case of overload, the motor is shut down by a
self-hold
thermal cutout in the winding.
Note: Only manual reset is possible. Switch off the pump
and disconnect from the power source. Identify and elimi-
nate the cause of failure. Wait approx. five minutes before
restarting the pump.
•
Note: In case of supply voltage below 100V, the lock
of the cutout might be impaired and the pump may
restart on its own after sufficient cooling down. Take
appropriate precautions, if an automatic restart of the
pump may lead to a dangerous situation (e.g., switch
off the pump and disconnect from the power source).
Maintenance and repair
In order to comply with laws (occupational, health and
safety regulations, safety at work law and regulations for
environmental protection) vacuum pumps, components
and measuring instruments can only be returned when
certain procedures (see section ”
Notes on return to the
factory”, pg. 67) are followed.
Take advantage of our service seminars, which put special
focus on the maintenance and repair of vacuum pumps.
For details and for the online ”Instructions for repair” man-
NOTICE