beautypg.com

Solberg Inlet Vacuum Filters User Manual

Page 10

background image



Solberg Manufacturing, Inc., 1151 Ardmore Itasca, IL 60143 USA

Ph: 630.773.1363 Fax: 630.773.0727 Email: [email protected] Web: www.solbergmfg.com

Rev:

MMVF-910


Page 10

SOLBERG

B. Hemisphere o-ring must rest evenly along canister/casting base o-ring

groove.

C. ST/CT/Small CSL: Hold canister housing against o-ring or sealing ring on

main filter head. Re-fasten wire-form clips or “claw” bolts.

D. Large CSL: Replace housing top plate. Feed T-bolts into corresponding

slots and tighten evenly around perimeter. Note: Do NOT over tighten!

E. VS/VL: Secure V-clamp by disconnecting hex nut or T-bolt portion and

placing V-clamp along the diameter of canister o-ring groove. Fasten T-
bolt and secure tightly. V-CLAMP LEGS MUST REST UNIFORMLY
ALONG ENTIRE O-RING GROOVE.

F. CSS: Reassemble top housing to bottom housing by aligning tabs and

turning into place.

Section D

MAINTENANCE RECOMMENDATIONS

1. Pressure drop readings are recommended to have an effective air filter.

Always document initial pressure drop during start-up when element is clean.
Replacement cartridge is needed when system experiences 10” to 15” / 250-
380mm H

2

O higher pressure drop above the initial reading. Refer to page 4

for instructions.

2. Always check replacement cartridge gaskets to insure they are adhered

uniformly along the end caps during handling. If not, contact Solberg
Manufacturing, Inc. immediately. Do not modify or change from Solberg
specified parts!

3. Always check inlets/outlets, element base and its components when replacing

element to insure cleanliness. Wipe clean if necessary.

4. Operate only when a proper seal exists.

5. VS/VL: Never operate without absolute assurance that V-clamp is secured

correctly along entire diameter of canisters. Check along V-clamp for wear.
Replace if any distortion occurs due to handling and usage.

SPARE PARTS

Contact your Solberg Representative for spare part model numbers.