Warning – Solberg LQB(Pg.2-14) User Manual
Page 13

Solberg Manufacturing, Inc., 1151 Ardmore Itasca, IL 60143 USA
Ph: 630.773.1363 Fax: 630.773.0727 Email: [email protected] Web: www.solbergmfg.com
Page 13
5. Securing side panel to housing.
A. Make sure all surfaces are free from dust and other particulate.
B. Feed threaded bolts on housing with corresponding holes on side panel.
C. Place belly bands on housing by threading bolt through corresponding
holes on belly bands.
D. Replace bolt, washer, and nut on belly band and tighten. See Figures
C.2.2 and C.5.1. Note: DO NOT over tighten!
6. Equipment Startup.
A. Be sure to read the instructions on installation or element replacement as
listed above before starting equipment.
*WARNING*
If at any time the operator is unable to verify
the integrity of the element or any housing
feature, the factory or a regional representative
should be contacted prior to start-up.
Figure C.5.1: Side panel and belly band in properly secured position.