beautypg.com

Warning – Solberg MiniFS(Pg.2-4) User Manual

Page 10

background image



Solberg Manufacturing, Inc., 1151 Ardmore Itasca, IL 60143 USA

Ph: 630.773.1363 Fax: 630.773.0727 Email: [email protected] Web: www.solbergmfg.com

Page 10

B. FS-(04, 05, 06, 07, 10, or 11): Reassemble housing top to base by

aligning tabs and turning into place.

6. Equipment Startup.

A. Be sure to read the instructions on installation or element replacement as

listed above before starting equipment.

*WARNING*

If at any time the operator is unable to verify
the integrity of the element or any housing
feature, the factory or a regional representative
should be contacted prior to start-up.


B. Please check the listed steps prior to startup.

1. Check element to make sure it is seated properly in housing

base.

*WARNING*

Failure to seat the element properly may result
in contaminant by-pass resulting in damage to
equipment.

2. Check housing to make sure the housing top is properly

secured to base. See procedure 5 and Figure C.5.1 for details.

Figure C.5.1: Housing tab alignment in sealed position.