Platform installation, Power source, Cleaning – Shellab SSI2-2 User Manual
Page 9: Installation (continued)

9 |
P a g e
INSTALLATION (CONTINUED)
P
LATFORM
I
NSTALLATION
The SSI2 and SSI2-2 come with a flat non-stick platform for low speed operation with common 
vessels, including trays and dishes. To install an optional platform the user must: 
Unscrew the four aluminum, platform thumb screws from the corners of the internal 
platform and remove the green rubber mat. 
Clean any dirt or debris from the metal base-platform and apply the desired optional 
platform so that the four corner holes are aligned. 
Screw in the four aluminum, platform thumb screws tightly by hand.
 
 
 
P
OWER
S
OURCE
Always position the unit so the end-user has access to the power plug.
Check the data plate for voltage and ampere requirements before making a connection. If the 
requirements match your power source, plug the power cord into an earth grounded outlet. 
Supplied voltage must not vary more than 10% from the data plate rating. Damage to the 
incubator may result if supplied voltage varies more than 10%. 
These incubators are intended for a 50/60 Hz application. Use a separate circuit to prevent loss of 
product due to overloading or circuit failure. 
Note: Electrical supply to the incubator must conform to all national and local electrical codes.
C
LEANING
The incubator interior was cleaned at the factory but not sterilized. See the
User Maintenance section for more information.
