Suggested field equipment and supplies – Pro Boat PRB2250 User Manual
Page 3
3
Suggested Field Equipment and Supplies
Hex Driver: 4mm, 3mm, 2.5mm, 2.0mm
Adjustable Wrench: large and small
Phillips screwdriver
Large pliers or channel locks
Threadlock (blue)
Cable Grease
CA or epoxy
Glass cleaner
Clean rags/towels
Gasoline and oil mixture
Fuel bulb or funnel
Hangar 9
®
Ratio-Rite
™
Cup (HAN3101)
8 “AA” alkaline batteries
Clear radio box tape
Spare cockpit securing knurled nuts
Although the Pro Boat
™
Miss Budweiser comes almost totally assembled, you will need a few tools and some accessories to keep it
running in top form. We recommend that you have the following items in your field kit:
Section 1: Building the Boat Stand
Step 1. Locate the plywood boat stand pieces (4). You will
see there are two identical pieces that are the sides. You will
also notice two end pieces. One of the end pieces has a deep
slot that has been cut out to allow room for the stuffing box
to clear. This piece measures 6'' in height. This will be the
back end piece. The other end piece measures 7'' in height.
This is needed to be used for the front end piece, as it will
allow clearance for the turn fin to be installed once you have
the boat rest on the completed boat stand.
Parts Needed
Plywood boat stand pieces (4)
Tools and Adhesives Needed
CA or epoxy
Step 3. Secure the interlocking boat stand with medium thick
CA or epoxy. Make certain that you allow the CA or epoxy
fully cure before placing the boat on the stand.
Step 2. Attach the side boat pieces into by interlocking them
into the end pieces as shown.