Inspect the mount before installing, Tpp installation – Chief Manufacturing Truss Pitch-Adjustable Mount TPP User Manual
Page 4
Instruction Manual
TPP
3
INSPECT THE MOUNT
BEFORE INSTALLING
IMPORTANT: Before installing the mount, make sure it has
not been damaged during shipping.
1.
Carefully inspect the mount for shipping damage. If any dam-
age is apparent, call your carrier claims agent and do not con-
tinue with the installation of the mount the until carrier has
reviewed the damage.
TPP INSTALLATION
Assembly
1.
Install the Nylon spacer on the stud in the corner of the face
plate (see Figure 1).
2.
Install the latching flag over the Nylon spacer.
3.
Secure the latching flag to the face plate using the 1/4-20
Nylock nut loose enough to move but tight enough to remain in
place when raised.
WARNING: It is the responsibility of the installer to verify that
the structure to which the TPP is anchored will
safety support the combined load of all attached
components and equipment.
4.
Securely anchor the back plate to the framework using Chief
TPK accessory clamps or equivalent rated fasteners for the
required load (see Figure 2).
5.
Install the pitch-adjustable plate on the back plate and secure
using four 5/16-18 X 1/2” hex head cap screws (see Figure 3).
Nylon Spacer
Latching Flag
10-24 Nut
stud
Figure 1. Install Flag
Figure 2. Anchor Back Plate
5/16-18 X 1/2” Hex Head Cap Screws
Figure 3. Pitch-Adjustable Plate to Back Plate