Compliant installation – Carrier Access Adit 3500 User Manual
Page 7

Adit 3500 - Release 1.6
7
Quick Start Guide
Installation
Compliant Installation
NOTE:
It is important the DS1/E1 Network Interface Cables are secured separately from the
power and Signal Cables.
1. Inspect the unit.
2. Mount the unit.
z
Wall mounting installation, see Wall Mounting on page 9.
z
Wall mounting with Battery Backup Unit, see Battery Backup on page 12.
z
Rack mounting installation, see Rack Mounting on page 10.
3. Ground the unit.
WARNING!
T
HE
A
DIT
3500
IS
REQUIRED
TO
BE
PERMANENTLY
GROUNDED
FOR
THE
PROTECTION
OF
USERS
AND
SERVICE
PERSONNEL
. R
EFER
TO
Grounding the Unit
ON
PAGE
3
FOR
DETAILED
INSTRUCTIONS
.
4. Connect DS1 (T1), and Ethernet connections as needed.
5. Connect RS-232 connector and connect via HyperTerm on your PC.
Note: With this running before power is enabled, you can monitor the boot process.
6. Attach PBX and phone line cables.
7. Connect Power to the unit.
8. Monitor the boot process on your PC, when complete the status light should be green.
9. For any software enabled features, enter the key command. See the key command in the Adit
3000 CLI Reference Manual, for detailed information.
10. To verify use the show version command.
11. To provision the unit. See Web-Based Management on page 23, for detailed instructions.