beautypg.com

Fitting the lamp installing the projector – OmniSistem PR Pilot 575 Wash User Manual

Page 4

background image

PILOT WASH 575 EN.doc

4/16

HOLE

SAFETY

CORD

HANDLES

(2PCS)

SAFETY CORD

PASSING THROUGH

4 HOLES FOR

CLAMPS

(2PCS)

SAFETY CORDS

(2PCS)

(2PCS PER CLAMP)

RETAINERS

WARNING

through 4 HOLES for safety!

 To pass 2 SAFETY CORDS

WARNING

through 4 HOLES for safety!

 To pass 2 SAFETY CORDS

CORD

SAFETY

HOLE

106

2

5

6

Take 2 clamps and 2 safety cords out from the package and mount 2 clamps on the
underside of fixture with 2 retainers attached to each clamp. Hang the fixture on the
structure and fasten the screws attached to each clamp. (Read the WARNING on the
underside of the base as shown above) To pass 2 SAFETY CORDS through 4 HOLES for
safety!
Always ensure that the projector is firmly anchored to avoid vibration and slipping
whilst functioning. Always ensure that the structure that you are going to mount the
projector is secure and is strong enough to support a weight of PILOT WASH 575.
WARNING: 1. Unlock the PAN and TILT before the 1

st

application of projector for safety.

2. The projector MUST be lifted or carried by the HANDLES instead of clamps.

Lock tilt before fitting/replacing the lamp.
(Do the way as shown in the above figure)
Loosen 2 lampholder screws as shown in the above figure and take out the lampholder.
Free worn­out lamp from lampholder.
Fit a new lamp and insert it with lampholder into the fixture, then fasten 2 lampholder screws.
After the fitting is done, turn the projector on and 5 minutes later adjust 3 adjusting screws to focus for
the best light output.
Notes: don’t touch the bulb of the new lamp with bare hand so as not to influence the beam
output.
WARNING: The MSR series are high­pressure lamps with external igniters (

). Care should

always be taken when handling these lamps. Always read the manufacturers "Instructions for
use" enclosed with the lamp.

FITTING THE LAMP

INSTALLING THE PROJECTOR