Q-Beam Operations Manual – 22-100002-01 – Rev 1 – 12-17-1999
Page 11
Q-Beam Final Checklist and Test Data
System Serial Number
Date of Manufacture
+5V: _______________
-5V: _______________
+7.5V: _____________
-7.5V: ______________
+ Current ___________________
- Current ___________________
Red Power__________
Green Power ________
PCB Serial #_________________
Test:
√
Test:
√
Initial power up – three beeps
LCD contrast and brightness
calibrated
Buttons tested
Sound activation mode tested
DMX-512 tested
Remote Interlock tested
Beam path alignment/red-green
convergence adjustment
Minimum 500K ohms – Chassis
ground to DC ground.
Optics cleaned.
Beam actuators calibrated for 45
°
(all actuator test)
Screws double-checked for
tightness.
Outer case checked for chassis
ground connection
PULSE Q-Beam Rear Panel
Information Labels (1010.3)
Aperture labels on all beam ports
(1040.10 (G) (5))
Q-Beam Logo Label
Min. 8 Hours Burn In
Tested By:
Date:
Quality Check:
Date: