beautypg.com

Q-beam final checklist and test data – OmniSistem Q Beam User Manual

Page 11

background image

Q-Beam Operations Manual – 22-100002-01 – Rev 1 – 12-17-1999

Page 11

Q-Beam Final Checklist and Test Data

System Serial Number

Date of Manufacture


+5V: _______________

-5V: _______________

+7.5V: _____________

-7.5V: ______________

+ Current ___________________

- Current ___________________

Red Power__________
Green Power ________

PCB Serial #_________________


Test:

Test:

Initial power up – three beeps

LCD contrast and brightness

calibrated

Buttons tested

Sound activation mode tested

DMX-512 tested

Remote Interlock tested

Beam path alignment/red-green

convergence adjustment

Minimum 500K ohms – Chassis

ground to DC ground.

Optics cleaned.

Beam actuators calibrated for 45

°

(all actuator test)

Screws double-checked for

tightness.

Outer case checked for chassis

ground connection

PULSE Q-Beam Rear Panel

Information Labels (1010.3)

Aperture labels on all beam ports

(1040.10 (G) (5))

Q-Beam Logo Label

Min. 8 Hours Burn In

Tested By:

Date:

Quality Check:

Date: