3 input module – NORAC UC5-BC-SM02 User Manual
Page 22
19
8.3 Input Module
1. Install the input module (E03) on the boom near the Summers valve block. Secure it to the
boom using cable ties or optional brackets.
2. Connect the free end of the CANbus cable (C02) from the valve module to the input
module.
3. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on
the side of the input module.
4. Insert the Left Up connectors on C20 into the Left connectors on the sprayer valve block.
Insert the Right Up connectors on C20 into the Right connectors on the sprayer valve
block. Connect the male and female “Right Down” connectors together. Connect the
male and female “Left Down” connectors together.
Figure 19: Input Module Connections
5. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1
connector on the side of the input module.
6. Insert the main up connectors on C21 into the main lift connectors on the sprayer valve
block. Connect the male and female “Main Down” connectors together.
7. If the sprayer does not have a bypass valve, connect the male and female “Aux 1”
connectors together. Connect the male and female “Aux 2” connectors together.