beautypg.com

2 valve assembly: double acting – NORAC UC5-BC-HD03 User Manual

Page 30

background image



27

10.2 Valve Assembly: Double Acting

1. On a clean surface remove the plastic plugs from the block.

2. Install two 3/8” x 1/4” BSPP (HD01) fittings into the “P” and “T” ports on the NORAC

block. Tighten to 18 ft-lbs (24 Nm).

3. Insert the two orifices (F01) into the “B” ports with the notch facing out.

4. Install two 3/8” x 1/4” BSPP (HD01) fittings into the “B” ports on the NORAC block.

Tighten to 18 ft-lbs (24 Nm).

5. Insert the two orifices (F01) into the “A” ports with the notch facing in.

6. Install two 3/8” x 1/4” BSPP (HD01) fittings into the “A” ports on the NORAC block.

Tighten to 18 ft-lbs (24 Nm).

Figure 26: NORAC Valve Block Details