3 input module – NORAC UC5-BC-GN05 User Manual
Page 18
15
8.3 Input Module
Cable C21 is shown in Figure 14 for informational purposes only. The interface
cable is ordered separately from this kit and may differ from the diagram below.
1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the
boom using cable ties or optional brackets.
2. Connect the free end of the CANbus cable (C01) from the control module to the input
module.
3. Insert the 12 pin plugs (P02) into the Thru 2 connector on the side and the OEM 3
connector on the end of the input module.
Figure 14: Input Module Connections
4. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1
connector on the side of the input module and insert the other connectors on C21 into the
main lift connectors on the sprayer valve block.
5. If the sprayer has a bypass valve, insert the 2-pin tee connector marked “AUX 1” into the
bypass valve connection.
6. Insert the 2-pin tee connectors marked “AUX 2” into the slant clockwise connection and
insert “AUX 3” into the slant counterclockwise connection.