beautypg.com

2 valve assembly: double acting – NORAC UC5-BC-FC02 User Manual

Page 29

background image



26

10.2 Valve Assembly: Double Acting

1. On a clean surface remove the plastic plugs from the block.

2. Install the 6MB-6MJ (F06) fittings into the “P” and “T” ports. Tighten to 18 ft-lbs (24 Nm).

3. Insert the two orifices (F07) into the “B” ports with the notch facing out (Figure 25).

4. Install the 6MB-6MJ (F06) fittings into the “B” ports. Tighten to 18 ft-lbs (24 Nm).

5. Insert the two orifices (F07) into the “A” ports with the notch facing in (Figure 25).

6. Install the 6MB-6MJ (F06) fittings into the “A” ports. Tighten to 18 ft-lbs (24 Nm).

Figure 25: NORAC Valve Block Details