beautypg.com

3 completing the installation – NORAC 4465BC+JD User Manual

Page 12

background image

9

4.3 C

OMPLETING THE

I

NSTALLATION

1. Start up your sprayer and test the sprayer’s

functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.

Again confirm that the cabling/hoses

are agreeable to the entire range of
motion.

2. If any functions do not work, review the

hydraulic and electrical portions of this
manual to check for proper installation. If
you still have trouble, contact NORAC for
assistance.

Before continuing, the control panel

must be updated to software version
7 or higher.

3. Turn on the power for the UC4+ Control

Panel using the switch on the side of its
chassis.

4. The procedure for the installation of the

UC4+ Spray Height Control is now
complete. Begin the AUTOMATIC SYSTEM
SETUP procedure as described in the UC4+
Spray Height Control Operator’s
Manual
.