beautypg.com

5 electrical installation – NORAC UC4+BC+HG1 User Manual

Page 19

background image

16

4.5 E

LECTRICAL

I

NSTALLATION

1. Install the UC4+ Control Panel (E01) in

the cab of the sprayer. Mount the panel
where it will be clearly visible and within
easy reach of the operator.

In the Hagie cab, a good spot to

mount the UC4+ control panel is
on the right hand side of the cab,
next to the spray controller

Figure 22: Control Panel Mounting

2. Follow Figure 2 and Figure 24 to

connect the UC4+ cabling.

Only connect the 3 pin shroud

off C10 on sprayers with model
number 2101.

3. Connect the 6 pin connector on C10 to

the valve extension cable C04.

4. Route C04 and C01 to the front of the

sprayer in the valve block vicinity.

5. Connect cable C02B to the free end of

C01.

6. Route one end of C02B to the boom

frame roll sensors.

7. Connect cable C06 to the other free

end of cable C02B and route cable
C06 to the chassis roll sensor, near the
cab.

8. Connect the sensor branch cable (C02)

to the free end of C02B. Route the
other ends of the sensor branch cable
to the three sensors.

Follow other hoses/cables along

the booms and make sure they
will not be stretched or pinched

during boom movements.

9. Connect cable C03 to the valve

extension cable (C04).

10. Connect the 2-pin connectors on C03

to the NORAC valve block.

11. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

12. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

ROP