7

7. If the valve block is not already installed

on the sprayer, install it as outlined in
the UC4+ Spray Height Control kit
installation manual.

8. Attach the straight 6FORX fittings on

the hoses (H02) to the A and B ports
on the expansion block. Route the free
end of the hoses (H02) to the Case

main lift tee, which is located near the
sprayer axle.

9. Disconnect the raise hose that runs

from the Case valve block to the main
lift tee and install the 6FORX 6MORT
(F03) onto the existing Case 6MORT
(Figure 4).

10. Connect the NORAC hose (H02) that

is connected to the B port on the
NORAC expansion block to the tee
fitting F03.

11. Reconnect the hose that runs from the

Case main lift valve block to the main lift
tee. This connects onto the tee fitting
F03.

12. Disconnect the lower hose that runs

from the Case valve block to the main
lift tee

13. Connect the NORAC hose (H02) that

is connected to the A port on the
NORAC expansion block to the tee
fitting F03.

14. Reconnect the hose that runs from the

Case main lift valve block to the main lift
tee. This connects onto the tee fitting
F03.

You must ensure no hydraulic

components will interfere with
any sprayer parts or be pulled

tight at any time.

Figure 4: Location of Main Lift Tees (When Looking From Front of Sprayer

towards the Rear)

Hoses running to

main lift cylinders

Main Lift Tee

connectors

Hoses running forward

to Case main lift block