3 hydraulic plumbing – NORAC UC4.5-BC-EV1 User Manual

Page 25

background image



22

8.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valves are mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 4.

2. Install tee fittings (EVRARD01) between the pressure and tank ports on the existing valve

block and the respective lines.

3. Connect hoses EVRARD02 from the tee fittings to the pressure (P) and tank (T) ports on

the NORAC block.

4. Remove the EVRARD hoses from the tilt cylinder “raise” lines. Ensure pressure has been

bled from the system before opening circuit.

5. Install tee fittings EVRARD04 onto the tilt cylinder. Connect the wing tilt “raise” lines to

the tee fittings using fittings EVRARD03.

6. Connect hoses EVRARD02 to the tee fitting using fittings EVRARD03. Connect the other

end of EVRARD02 to the “B” ports on the NORAC valve block.

7. The “A” ports on the NORAC block are plugged. The “lower” lines of the cylinders are to

remain attached to the EVRARD sprayer valve block.

8. Fit restricted fitting (EVRARD05) between the tilt circuit and the tilt circuit accumulator.