NORAC UC4.5-BC-HD9 User Manual
Page 15
12
7. Route C11 to the vicinity of the valve block at the rear of the sprayer.
Figure 11: Cable Connections
8. Connect the 6-pin tower (T6) on t cable C17 to the mating 6-pin shroud (S6) on C11.
9. Connect the 3-pin shroud (S3) on cable C17 to the mating 3-pin tower (T3) on C11.
10. Route the free end of C17 to the existing valve block.
11. Connect the tees labeled “LEFT” and “RIGHT” on C17 to the HARDI left and right valve
connections, respectively.
12. Connect the tees labeled “DIR UP” and “DIR DOWN” on C17 to the HARDI direction
up and direction down valve connections, respectively.
13. If using cable C13, remove the pins from the 3-pin shroud (S3) using the pin removal tool
(M10).
14. Insert the wires from C13 into the 3-pin shroud on cable C17 in the same positions as they
were in the previous connector. (The BLACK wire in the A position and the WHITE wire
in the B position)
15. Insert the tee on C13 between the connectors on the bypass valve.
16. Fasten the 8-way coupler to the boom with cable ties. Connect P6 on C11 to the 8-way
coupler.
17. Connect both roll sensors to the 8-way coupler.