8 hydraulic installation, 1 valve assembly – double acting – NORAC UC4.5-BC-HD1 User Manual
Page 22
19
8 Hydraulic Installation
Ensure all pressure has been bled from the system before disconnecting any lines
or fittings. Hydraulic pressure will exist on the wing tilt circuits unless the wings
are being supported by other means. The hydraulic installation may be performed
with the wings in transport position, resting on the ground or with the tilt cylinders
fully extended.
Component failure due to oil contamination is not covered under the NORAC
UC4.5 system warranty. It is recommended that a qualified technician perform the
hydraulic installation.
8.1 Valve Assembly – Double Acting
1. On a clean surface remove the plastic plugs from the block.
2. Install the 6MB 6MJ (F02) fittings into the “P” and “T” ports on the NORAC block. Tighten
to 18 ft-lbs (24 Nm).
3. Insert the orifices (F01) into the “B” ports with the notch facing out.
4. Insert the orifices (F01) into the “A” ports with the notch facing in.
5. Install the 6MB 6MJ (F02) fittings into the “A” and “B” ports on the NORAC block. Tighten
to 18 ft-lbs (24 Nm).
Figure 17: NORAC Valve Block Details – Double Acting