7 software setup – NORAC UC4.5-BC-AS1 User Manual
Page 17
14
7 Software Setup
1. Start up the sprayer and test the sprayer’s functionality. The control panel does not need
to be powered on for the original boom function switches to operate. Unfold the booms
and raise/lower each boom and the main section.
Confirm that the cabling and hoses are agreeable to the entire range of motion.
2. If any functions do not work, review the hydraulic and electrical portions of this manual to
check for proper installation.
3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.
4. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5 Spray
Height Control Operator’s Manual (M01).
Performance may be limited during the Control System Test in the
Automatic Setup since the slant valve has not been calibrated yet. It is
recommended to repeat the control system test again after the slant valve
has been calibrated.
5. After the AUTOMATIC SYSTEM SETUP, the slant valve must be manually calibrated the as
described in Section 8.
6. For optimal performance of the UC4.5 system, there should be very little play at the hitch
clevis. The addition of polymer washers can help tighten up this connection (Figure 14).
Figure 14: Hitch Point