beautypg.com

NORAC UC4.5-BC-AS1 User Manual

Page 16

background image



13

8. Connect the 3-pin tower (T3) on the roll interface cable (C16) to the mating 3-pin shroud

(S3) on C11.

9. If there is an enable valve on the sprayer block, connect 3-pin shroud (S3) of C13 to T3 on

C11.

10. Route the free ends of C12, C16 and C13 to the existing valve block.

11. Splice the loose wires of C12, C16 and N1C of C13 into the existing wiring to tee in to

appropriate functions of the sprayer’s control system.

The following wires are not used for this installation:

C12: N1D, N1E, N1F, N1G
C13: N1A, N1B

See UC4.5-BC-CABLE-GUIDE cable ordering guide for more information.

12. Fasten the 3-way coupler to the boom with cable ties. Connect P6 on C11 to the 3-way

coupler.

13. Connect two cables (C05) to the 3-way coupler and route along the booms to the wing

sensors. Follow existing cables and hoses to be sure the cable will not be pinched or
stretched.

14. At the sensor brackets, attach a 2-way coupler with terminator (E20) to the sprayer boom.

The 2-way coupler with terminator is the white two way coupler. Plug the sensor and the
CANbus cable into the 2-way coupler.

IMPORTANT:

Provide enough slack in all cables to account for all boom movement and
FOLDING boom movement.