LAARS POWER VENTED GAS WATER HEATER - Installation Manual User Manual
Page 22

22
Venting (Part II) continued-
TABLE 7
2” (5.1 cm) VENT PIPE LENGTHS FROM INSIDE WALL FOR LOW
GROUND CLEARANCE INSTALLATIONS
Terminating #
of
Elbows
Max straight
Length ft (m)
Min straight
Length ft (m)
(2) 90
° Elbows with Vent Terminal
1 30
(9.1) 2
(.6)
(2) 90
° Elbows with Vent Terminal
2 25
(7.6) 2
(.6)
(2) 90
° Elbows with Vent Terminal
3 20
(6.1) 2
(.6)
(2) 90
° Elbows with Vent Terminal
4 15
(4.6) 2
(.6)
TABLE 8
3” (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating (Reduce 3” to 2”)
(Reduce 7.6 cm to 5.1 cm)
#of
Elbows
Maximum
Length ft (m)
Minimum
Length ft (m)
(2) 90
° Elbows with Vent Terminal
1 100
(30.5) 10
(3.1)
(2) 90
° Elbows with Vent Terminal
2 95
(29.0) 10
(3.1)
(2) 90
° Elbows with Vent Terminal
3 90
(27.4) 10
(3.1)
(2) 90
° Elbows with Vent Terminal
4 85
(25.9) 10
(3.1)
(2) 90
° Elbows with Vent Terminal
5 80
(24.4) 10
(3.1)
HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,500
FEET (610 m) ABOVE SEA LEVEL
The capacity of the induced draft blower declines with increasing altitude due to
a reduction in the air density. In order to assure safe and reliable performance
of the water heater, contact the supplier for high altitude kit.