Assembly instructions 2, Chapter – Vermont Casting 6000 User Manual
Page 9
Getting Started
Unpacking the Grill Parts
Liquid Propane Models
Natural Gas Models
1. Please follow the steps in the order that
they are presented.
2. Assemble the grill where you plan to use it.
3. You may want to place an old towel or
cloth at the assembly site to prevent nuts and
bolts from becoming lost.
4. Have a friend help. An assistant can make
the assembly easier by holding the parts in
place while you fasten the nuts and bolts.
5. To be ready to barbecue immediately, have
the L.P. gas cylinder filled by an authorized
L.P. dealer or cylinder exchange center.
1. Remove and set aside all inner boxes and
parts from the master carton.
2. Remove and set aside all wrapping paper
and additional packaging from the parts.
3. Do not destroy carton or packing until your
grill is completely assembled and operating to
your satisfaction.
If a L.P. gas cylinder has been included with
your L.P. gas grill, it has been shipped empty
for safety reasons. To be ready to grill
immediately, please have the fuel cylinder
filled with L.P. gas by an authorized L.P. gas
dealer. Some L.P. gas grill models do not
include a L.P. gas cylinder.
Natural gas grills require a connection to a
natural gas supply. The gas connection should
be made only by a qualified installer or a
licensed plumber. The gas supply line must
not be installed by the consumer.
9
Assembly Instructions
2
Chapter
6000, 8000 Series Gas Grill
3/8
7/16
flat-head screwdriver
7/16” open-end wrench*
*
Tools needed to assemble grill:
·
·
A socket set or an adjustable
of the open-end wrenches.
wrench may be used in place
phillips-head screwdriver
3/8” open-end wrench*
·
·
(For side burner equipped grills)
Note: You may notice during assembly that hardware
bag “B” is used before hardware bag “A”. The
assembly procedure has been improved from the
original sequence to make assembly easier. However,
hardware packaging has not been changed.
Getting Started
Unpacking the Grill Parts
Liquid Propane Models
Natural Gas Models
1. Please follow the steps in the order that
they are presented.
2. Assemble the grill where you plan to use it.
3. You may want to place an old towel or
cloth at the assembly site to prevent nuts and
bolts from becoming lost.
4. Have a friend help. An assistant can make
the assembly easier by holding the parts in
place while you fasten the nuts and bolts.
5. To be ready to barbecue immediately, have
the L.P. gas cylinder filled by an authorized
L.P. dealer or cylinder exchange center.
1. Remove and set aside all inner boxes and
parts from the master carton.
2. Remove and set aside all wrapping paper
and additional packaging from the parts.
3. Do not destroy carton or packing until your
grill is completely assembled and operating to
your satisfaction.
If a L.P. gas cylinder has been included with
your L.P. gas grill, it has been shipped empty
for safety reasons. To be ready to grill
immediately, please have the fuel cylinder
filled with L.P. gas by an authorized L.P. gas
dealer. Some L.P. gas grill models do not
include a L.P. gas cylinder.
Natural gas grills require a connection to a
natural gas supply. The gas connection should
be made only by a qualified installer or a
licensed plumber. The gas supply line must
not be installed by the consumer.