TOOLS REQUIRED:

(1) 3/8” Socket Wrench and Box Wrench

(1) 7/16” Nut Driver

(1) 9/16” Socket Wrench and Box Wrench

(1) Cable Cutters

(1) 3/16 in Rivet Gun


SPECIAL NOTES:

Spacing between poles is 40 ft.

Net should be removed and stored after the season is over.

Net should be removed prior to a major storm or high winds.


Layout & Excavation:
Clear working area from obstructions. Determine the proper location for the poles on the
field. (See Figure 2)

Install Sleeves:
Dig footing hole using the dimensions shown in Figure 1. Pack bottom of footing hole
with 12” of gravel or concrete block or pour 12-1/4 inch concrete pad and allow concrete
pad to cure for 48 hours. Install ground sleeve and pour concrete as shown in Figure 1.
While not required, Jaypro recommends using 6 lengths of 5/8 inch rebar, 54 inches long,
wired together into a 24 inch diameter basket and placed around the ground sleeve in the
footer hole. Wait 48 hours before inserting poles. The top of the ground sleeve should be
flush with the finished grade.

Figure 1









Figure 2

Concrete, block or crushed stone.

CONCRETE

Note these are suggested dimensions for average
soil conditions, consult local building codes.

STEEL REBAR

40’ BETWEEN POLES