beautypg.com

Back sl id e – Jaypro Sports FNFB-30 User Manual

Page 4

background image

Rev: -

Page 4 of 8

Install Pole Hardware:
The pole is assembled prior to lifting into the ground sleeve.

Assemble 3/8” eyebolt hardware & 1/4" cleat hardware and pole cap onto the poles as
shown in Figure 3 & 4. Route the hoisting rope through the pulley. Attach the snap hook
to the hoisting rope with a bowline knot. Temporarily attach the free end of the hoisting
rope to the snap hook.

HOISTING ROPE x 65 FT LONG (BOW LINE KNOT)

Figure 3

3/8" FLAT WASHER

STAINLESS STEEL

6 5/8 ID BLACK CAP

3/8"-16 HEX HD LOCKNUT

2'' SWIVEL PULLEY

3/8” QUICK LINK

STAINLESS STEEL

HOISTING ROPE x 85 FT

LONG (BOW LINE KNOT)

3/8" FLAT WASHER

STAINLESS STEEL

TOP OF POLE

5/16" x 3 1/8" SNAP HOOK

~

Back

sl

id

e

~

TEMPORARILY TIE ROPES
TOGETHER