Jaypro Sports BSP-33-2 User Manual
Page 5
Page 5 of 10
Overhang Panel Assembly
Note: Proper Equipment / manpower will be needed for this part.
1. Assemble the center panels on the ground and lift up to be attached to the bands. (See exploded
views for more detail.) Note that the center panels are similar to the ones in the upright panel
assembly.
2. Once all panels are up, cap the upright with the end cap.
3. Install horizontal reinforcing bars into the chain link panel and attach this to the band tension
with 5/16” hardware. Note the over hangs panels on the end are shape like trapezoids with one
tapered side.
A
B
82” LONG
112” LONG
113-1/2” LONG
NOTE 69” LONG WELDED RAIL
NOTE 60” LONG WELDED RAIL
NOTE END CAP
See also other documents in the category Jaypro Sports Sports and recreation:
- GNJA1 Installation (7 pages)
- BLPS-84 (5 pages)
- BBLD-5000 (18 pages)
- BLFS-101 (5 pages)
- BSP-30 (5 pages)
- BSP-40 (5 pages)
- BSP-40-66 (9 pages)
- BSP-30-6 (9 pages)
- BSP-44-22 (10 pages)
- BBTF-55 (8 pages)
- PROTF-55 (7 pages)
- BBTFSM-55 (10 pages)
- BBC-SPDKT (13 pages)
- BBC-700M (24 pages)
- BBC-WLKT (10 pages)
- BBC-SPRTKT (8 pages)
- CVS-10 (2 pages)
- BGLC-7500RD (24 pages)
- BBLS-12 (14 pages)
- BBGS-18RB (15 pages)
- BBFP-20 (5 pages)
- BBFP-30 (13 pages)
- FS-101 (4 pages)
- FS-77 (4 pages)
- PS-84 (5 pages)
- BLFSW (5 pages)
- BLFS-88 (5 pages)
- PSTS-77 (5 pages)
- LC-1 (3 pages)
- LC-6 (16 pages)
- PBEL54 (31 pages)
- MBBP-6 (2 pages)
- GBDD-AHA (9 pages)
- GAK-5 (4 pages)
- GBA-542 (10 pages)
- TSP-200 (15 pages)
- TSP-44 (15 pages)
- 996 (4 pages)
- 656 (4 pages)
- PBB-200 (13 pages)
- PBEL-SCB (6 pages)
- Stationary Backstops (16 pages)
- WM-48 (5 pages)
- WMSS (13 pages)