beautypg.com

Jaypro Sports BSP-33-2 User Manual

Page 4

background image

Page 4 of 10

Upright Panel Assembly

1. Install all brace bands and band

tensions by sliding them from
the top of the upright (see the
illustration to the right). DO
NOT STRETCH THE BANDS.

2. The orientation of the tension

band must be consistent. As one
side of the tension band is off
set for attaching the galvanized
chain link fence flush to the
pipe.

3. Insert the 113-1/2” long pipe

into the rail ends. Attach this to
the brace bands with 5/16”
carriage bolt, washer & nut
hardware.

4. Weave the 3/16” thick bar

tension into the chain link panel
and attach this to the band
tension with 5/16” hardware.

5. Repeat previous step till all the

panels is enclose with chain
link.

Step 1 & 2 & 3

S

tep 4