Optional equipment, Notice – EDCO POWER TROWELS User Manual
Page 10
![background image](/manuals/674279/10/background.png)
Printed in USA
©2011
TVW
Page 10
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com • Email: [email protected]
E-PT-I-0111
Tote-A-Trowel
TM
Lev-L-It
TM
System
***NOTICE***
***NOTICE***
READ ALL INSTRUCTIONS BEFORE OPERATING EQUIPMENT
Optional Equipment
All items on this page are available as optional equipment by contacting EDCO.
Tote-A-Trowel
TM
Transporting System:
• Rotate the handle until one blade is directly
under the handle. (Review Figure 5)
• Set the Tote-A-Trowel
TM
directly behind that
blade and hook it to the outside bottom ring of
the trowel.
• Lift the handle and allow the Tote-A-Trowel
TM
to
pivot under the trowel blade.
• Apply downward pressure on the handle until all
the weight of the trowel is riding on the wheels
of the Tote-A-Trowel
TM
.
• Reverse this procedure to release the Tote-A-
Trowel
TM
.
LEV-L-IT
TM
System:
• EDCO offers an optional LEV-L-IT
TM
system to allow the operator the
ability to instantly change the pitch of the trowel blades, then just as
quickly, change back to the original blade pitch. Use of this feature is
based on the desired performance for the specifi c job application.
Light Kit
Light Kit:
• An optional light kit is available for new electric trowels. An On/Off toggle
switch will activate the light.
NOTE:
On some trowels, the blades must be turning before the light will
function.