Attach the rail to the header bracket, Installation step 3 – Chamberlain 3575S User Manual
Page 10
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
•
Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll need
help. Have someone hold the opener securely on a
temporary support to allow the rail to clear the spring.
•
Position the rail bracket against the header bracket.
•
Align the bracket holes and join with a clevis pin
as shown.
•
Insert a ring fastener to secure.
HARDWARE SHOWN ACTUAL SIZE
Header
Bracket
Chain
Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Chain
Pulley
Bracket
T-Rail
See also other documents in the category Chamberlain Kitchen:
- POWERDRIVE PD612D (36 pages)
- 3575K 3 HP (36 pages)
- 1346 - 1HP (40 pages)
- 2500B (36 pages)
- WD962KD (44 pages)
- 956CB (1 page)
- 7902 (40 pages)
- 2245 (36 pages)
- 1270LMC (36 pages)
- 5000E - 1/2 HP (28 pages)
- WD822KD 1/2 HP (40 pages)
- 945CB (1 page)
- 3585S 3/4 HP (40 pages)
- 3800E (72 pages)
- 2565 1/2 HP (36 pages)
- CG40DM (40 pages)
- WD822KS 1/2 HP (40 pages)
- 585 3/4 HP (36 pages)
- 1000SDC-R (36 pages)
- 1200 (40 pages)
- 1000 (8 pages)
- 2220-267 1/2 HP (36 pages)
- 3800PLD (36 pages)
- 801CB (8 pages)
- 985 (36 pages)
- 3850 (40 pages)
- POWER DRIVE PD200 (40 pages)
- 953EVC (2 pages)
- 2220RGD 1/2 HP (36 pages)
- BG 3000-B3 (36 pages)
- 4200 1/2HP (40 pages)
- POWER DRIVE 950CB (1 page)
- 1160-1/2HP (28 pages)
- CLDM1 (4 pages)
- 953D (1 page)
- 1265 (36 pages)
- 1000SDR 1/3 HP (36 pages)
- 248735 3/4 HP (40 pages)
- 2500 (36 pages)
- 974-315LM (4 pages)
- 248730 (44 pages)
- WD962KEV (48 pages)
- 963D (2 pages)
- 248739 (44 pages)