Jaclo Thermostatic extension kit - J-TH34-EXT User Manual
Page 7

7
PACkAGING
Objective: Effectively package completed thermal valve for inventory.
J-TH34 | PG 7
›
Using box (#192066), tape base together.
Figure 7.1
›
In the bottom of the box include two flush adapters with procedure instructions
and the J-TH34 thermal valve installation instructions.
Figure 7.2
›
Place a sheet packaging paper in base of box.
›
Place completely assembled valve in box
›
Place a sheet of packaging paper on top of completed thermal valve.
›
Close tabs and secure using packaging tape.
›
Install J-TH34 label with UPC bar code on one end of box.
Figure 7.3
›
Install red colored “ATTN: Plumber!” label on top of box.
Figure 7.4
›
Record how many valves were completed on the work order. If valves were
found in non compliance status, record the quantity and reason for non
compliance.
›
Refer to step 5 for destruction process of valves in non compliance.
›
Record how many valves were completed on tracking log.
›
Place valve on shelf in pick area
7.1
7.2
7.3
7.4