Coffee brewing instructions, Touch screen control module – Wilbur Curtis CGC User Manual
Page 2

2
1. Brewer should be ON (Confirm at the rear toggle switch). The screen should read Ready to Brew.
2. Place an empty cup under the brewcone.
6. Select the desired coffee
size. Touch and hold for two
seconds to start brewing.
5. Slide the filled brewcone into
the brew rails on the brewer.
3. Place a clean filter into the
brewcone.
4. Fill brewcone with the
proper amount of ground
coffee.
COFFEE BREWING INSTRUCTIONS
WARNING TO AVOID SCALDING, Do not remove brewcone while brew light is flashing.
Touch Screen Control Module
The touch screen turns on when power is available to the controller. The screen will contain standard control feature such as symbols and buttons. Pressing these elements with
your finger tip will activate the programming functions. The default screen, as well as some added control buttons are shown in the illustration below.
STATUS LIGHTS
BREW BUTTONS
CURTIS LOGO
TO ENTER PROGRAMMING
Tap Curtis logo 5 times to bring
up the ACCESS CODE screen.
RETURN TO HOME
SCROLL
RETURN TO PREVIOUS
CONTROL SYMBOLS
All of these symbols may
not be visible at one time.
Your Curtis Gold Cup Series is Factory Pre-Set for Optimum Performance.
After connection to water and power; turn on the brewer at the rear toggle switch. You will hear a beep and the status lights will come on for a moment.
The screen will display
. Next
is displayed. Water will fill the tank (2-3 minutes depending on water flow rate).
When the proper level is reached
will appear on the screen. It takes approximately 30 minutes to reach the set point temperature.
Control will display
when temperature reaches the set point. The unit is now ready to brew.
MODEL NUMBER
CONTROL BD NUMBER
READY TO BREW
HEATING
FILLING