beautypg.com

Add top rails, Install the gate – Petsafe 2-in-1 Dog Kennel User Manual

Page 6

background image

6

1-888-632-4453

Add Top Rails

1. Gather 4 corner rails, 4 frame rails, 18 clamps and 9 -

5

/

16

" X 2" carriage bolts with nuts.

2. Point all top rail swedges clockwise the same as the bottom frame.
3. Connect rails to all posts (4A). Tighten all clamps as you go.

5A

Important: Check that all posts are straight up and down. Confi rm that all nuts are tight.

____________________________________________________________________________________

Install the Gate

1. Gather male and female hinges, 4 - 3/8" X 2" carriage bolts with nuts, and the gate. Note: Gate can open

from either side.

2. Install the upper female hinge below the upper most gate clip (5B).
3. Install the lower female hinge directly above the bottom gate clip (5C).
4. Position the gate centered in the gate opening.
5. Attach bottom male hinge and slide up to meet bottom female hinge. Tighten securely (5C).
6. Attach top male hinge and slide down to meet top female hinge. Tighten securely (5B).
7. With an adjustable wrench, install the gate latch 36" from the ground (5A). Note: The gate latch can be

locked. Lock not provided.

5A

5B

5C

Step

4

Step

5