beautypg.com

Fast-cast 175 wiring instructions – Curtis 175 User Manual

Page 11

background image

TRACTOR CAB INC.

August 2001

1170

10

1. First, install switch at desired location. This will determine what your proper wire length is to be.

2. Run spreader/vehicle harness from the rear of vehicle to switch area. Remove approx. 3'' of the black outer jacket

exposing two single leads (red and black), strip a 1/4'' off each lead. Crimp 1/4'' female connector on red lead and
crimp the butt connector to the black lead. Place the female spade/red wire to the on/off switch and leave the black
wire for the next step.

3. Route the power harness from the battery to the switch; this will determine your proper length to cut wires. Repeat step

#2 regarding cable jacketing and connection points to the switch and butt connector.

4. Install an inline 30 amp. fuse on the positive (red) lead from the battery to the switch. Locate an easily accessible place,

out of the elements, for the fuse and remove approx. 3'' of the black outer jacket exposing two single leads (red and
black). Cut the red lead in half and strip a 1/4'' off each lead. Insert into the fuse connector and crimp. Insert 30 amp.
blade fuse into connector.

5. At the battery end of the power harness, remove 8'' of the black outer jacket exposing two single leads (red and black).

Strip 1/4'' off each lead. Crimp a 3/8'' lug terminal to each lead and attach the red lead to the positive side of the
battery and the black lead to the negative side of the battery.

6. Install rubber weatherproof boot on switch before finishing installation.

Fast-Cast 175 Wiring Instructions

This manual is related to the following products: