beautypg.com

Tjernlund SS1C SideShot with UC1 Universal Control (Version X.06) 8504103 Rev D 07/05 User Manual

Page 18

background image

15

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED

WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

U

N

IVER

SAL C

O

N

T

R

O

LLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C
Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS1C electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.

NOTE: If burner primary control goes out on lockout, the SideShot will continue to run as long as a call for heat is present.

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED TO AN OIL-FIRED FURNACE

WITH A HONEYWELL T87 OR EQUIVALENT NON-POWERED THERMOSTAT

XN

R

UNIV

E

RS
A

L CO
NTRO

LLE

R

REMOVE JUMPER TO AVOID

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

DRY

115V

24V

IMPORTANT:

BACKFEEDS OR SHORT

50/60 Hz

SUPPLY
115 VAC

NON-POWERED THERMOSTAT

F
F

T

T

D/N 9183047-1

PRIMARY CONTROL

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

OR EQUIVALENT

5 VDC BOARD-GENERATED

LEGEND:

115 VAC

DO NOT SUPPLY POWER!

POWER.

LOW VAC

HONEYWELL T87 OR EQUIVALENT

W

O

WHITE

ORANGE

B

BLACK

HONEYWELL

R8184 SERIES

IMPORTANT:

FACTORY-

WIRED

CIRCUITS.

1. IMPORTANT: Remove J1 & J2 Call Jumper on UC1 to avoid backfeeds or short circuits.
2. Connect T87 or Equivalent non-powered thermostat to A and B terminals on UC1.
3. Remove T T Jumper from R8184 or equivalent Primary Control.
4. Connect #3 on UC1 terminal block to T terminal of Primary Control.
5. Connect #4 on UC1 terminal block to remaining T terminal of Primary Control.
6. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
7. Crimp Ground wire to grounding spade in SS1C electrical box.
8. Make sure RED voltage jumper on UC1 is on DRY.
NOTE: If burner safety control goes out on lockout, the SideShot will continue to run as long as a call for heat is present.