beautypg.com

Preparing the meter – ETS-Lindgren HI-1801 Microwave Oven Survey Meter User Manual

Page 18

background image

18

|

Operation

Preparing the Meter

1.

Remove the meter from the carrying case. Make sure the spacer cover

is intact and firmly seated on the probe. Check the cover for signs of

wear or contamination; replace if worn or contaminated.

2.

The ON/OFF switch must be moved to either the “ON” or the “CHECK”

position to operate the unit.

The “PWR” light will come on when the

ON/OFF button is held in either position and the instrument is

operating.

3.

Turn the ON/OFF switch to either the ON or the CHECK position. The
“LOW BATT” light will come on if the batteries need to be replaced.

Replace the batteries before continuing. See the Maintenance section

for battery replacement instructions.

4.

While operating the ON/OFF switch in the “ON/10 MW” position, use

the large knob to adjust the meter to a ZERO indication.

The probe must be in a zero microwave field with no RF energy

present for accurate zeroing.