CellarPro 4000SH HORIZONTAL SPLIT SYSTEM 220V 50/60HZ, 16270 User Manual
Page 24

24
Installation Tips and Guidelines
When brazing copper tubing to the service valves, use 95/5 solder and
soldering flux. Do not use silver solder because it requires higher heat that
will damage the service valves.
Make sure all electrical connections are secure.
Inspect Evaporator and Condensing unit fans to confirm airflow. There
shouldn’t be any excessive vibration, noise or obstructions to airflow.
Observe system pressures during charging and initial operation and keep note
of them as they will be required for the Service and Support Data Sheet which
initiates the warranty.
Continue charging until system has sufficient refrigerant for proper operation.
Do not overcharge or use refrigerant with additives.
Remember that bubbles in a sight glass may be caused by a restriction as well
as a shortage of refrigerant.
Do not leave unit unattended until the system has reached normal operating
conditions.
Make sure all access valve caps are in place and tight.
Make sure liquid and suction service valves are properly back-seated and
tighten valve packing if necessary.
Make sure the condenser fan cuts-in at 171 PSIG and cuts-out at 104.5 PSIG.