Salter Brecknell MS-50M User Manual
Page 2

2
I.
Pillar Installation (Fig.2):
1. Upright insert the pillar to the bracket on frame
2. Use the screws and washer to fix the pillar in a vertical position
II.
Connect the steelyard rod to long lever (Fig.3):
1. Lay the pillar on a table (Fig.3)
2. Disassemble the wires on the levers.
3. Insert the wrench to the small hole in front of the steelyard rod, and pull the
hook of steelyard rod with the hook of wrench (Fig. 3-1)
4. Push the long lever frontward, then hook the bearing of the steelyard rod on the
pivot of the long lever (Fig. 3-2)
See also other documents in the category Salter Brecknell Scales:
- PB500 (4 pages)
- PB250 (12 pages)
- MB2610 (4 pages)
- MBS Series (14 pages)
- 302BP (6 pages)
- 304BP (26 pages)
- 308BP (27 pages)
- APD-100 (36 pages)
- CB100 (8 pages)
- ESA Series (14 pages)
- LPS30 (18 pages)
- PC150 (13 pages)
- SP60 (9 pages)
- 3700LP (20 pages)
- C3235 (16 pages)
- C3255 (18 pages)
- C3225 (40 pages)
- B140 (32 pages)
- B120 (19 pages)
- B130 (22 pages)
- 610 (23 pages)
- 630 (24 pages)
- 650 (43 pages)
- B220 (24 pages)
- B225 (44 pages)
- CS Series Crane (12 pages)
- 3800LP Series Calibrated with SBI-505 LED Indicator (22 pages)
- 405 (12 pages)
- LPS150 (30 pages)
- GP100 (13 pages)
- S100 (17 pages)
- PS150 (15 pages)
- S122 (63 pages)
- 6702 (28 pages)
- 6712 (24 pages)
- PS250 (28 pages)
- PS500 (19 pages)
- PS1000 (38 pages)
- PS3000HD (18 pages)
- SBI140 (35 pages)
- SBI100 (34 pages)
- SBI-521 (82 pages)
- 200 Series (47 pages)
- 200SL (2 pages)
- 400ES (30 pages)