beautypg.com

Contents of hardware pack – Craftsman 917.292402 User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

BAG OF PARTS

Your new tiller has been assembled at the
factory with exception of those parts left

unassembled for shipping purposes. To
ensure safe and proper operatiori of your
tiller all parts and hardware you assemble

must be tightened securely. Use the correct

tools as necessary to insure proper tight­

ness.

TOOLS REQUIRED FOR ASSEMBLY

A socket wrench set will make assembly
easier. Standard wrench sizes are listed.
(1) Utility knife

(1) Screwdriver
(1) Pair of pliers
(2) 1/2" wrenches
OPERATOR’S POSITION

When right or left hand is mentioned in

this manual, it means when you are in
the operating position (standing behind
tiller handles).

Front

Left

Right

Operator’s Position

CONTENTS OF HARDWARE PACK

(1) Clevis Pin

(1) Manual

7^

(1) Plastic
Cable Clip

(1) Washer

9/32

X

1/2

X

14 Gauge

(1) Cotter Pin

(2) Flange

Locknuts

5/16-18 UNC

(2) Hex Bolts

5/16-18x1-1/4

©

©

©

(2) Hex Nuts

(

2

) Lock

5/16-18

Washers

/.>v n ui

wasners /.,v

Engine Oil

(1) Reverse
Rod Bracket

(1) Bushing

S

ltitifililllflillRffl

(2) Carriage Bolts ,
5/16-18 UNC x 2-1/2