Preparing for installation, Required tools and equipment, C h a p t e r – Cisco 7300-6T3 User Manual
Page 23

C H A P T E R
2-1
Clear Channel 6-Port T3 (DS3) Line Card Installation and Configuration
OL-3449-02
2
Preparing for Installation
This chapter describes the general equipment, safety, and site preparation requirements for installing the
6T3 line card. This chapter contains the following sections:
•
Required Tools and Equipment, page 2-1
•
Software and Hardware Requirements, page 2-2
•
75-Ohm In-Line Coaxial Attenuator (Optional), page 2-2
•
Required Tools and Equipment
You need the following tools and parts to install a line card. If you need additional equipment, contact
a service representative for ordering information.
•
6T3 line card
•
T3 SMB interface cables
•
Number 2 Phillips screwdriver
•
Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares
•
Antistatic mat
•
Antistatic container
•
Attenuator kit (optional)