System assembly, Trial running – Scilogex OS20-Pro User Manual
Page 7

5
Digital (Enhanced) Overhead Stirrer
4.System assembly
a.Install stand
The stand must be assembled
according to the following
instructions. Adjust the
height of the main unit, and
the distance from main unit
to the support holder by
rotating the locking device.
Anti-drop protector can be
adjusted up or down, ensure
the locking position is
suitable for fixing the main
unit, and then attach the
main unit to the stand.
Figure 1
b.Install stirring impeller
Plug the stirring impeller
into the drill chuck. Adjust
the stirring impeller which
is held in position securely.
Clockwise tighten the drill
chuck firmly using the
chuck key.
Figure 2
Note:
Overhead stirrer is a high-speed running device,
the system are required to lock securely the
corresponding components in each step of the
assembly to avoid any movement of the main
unit or stirring impeller which would be caused
harm or damage to peripheral instrument and
personnel.
5.Trial running
Follow the instructions below to trial operate:
•
Ensure the required operating voltage and power supply
voltage matched.
•
Ensure the socket must be earthed reliably.
•
Connect the power cable,ensure the power on and
begin self-checking.
•
Rotate the stirring button and set stirring speed.
•
Press stirring button and start stirring.
•
Press again the stirring button and stop stirring.
If these operations above are normal, the instrument is
ready to operate. If not, the instrument may be damaged
during transportation, please contact technical support of
manufacturer/supplier.