Installation, Unpacking the aggregator, Unpacking steps – Dell PowerEdge FX2/FX2s User Manual
Page 8
4
Installation
This switch installation procedure assumes that the Dell PowerEdge FX2 server chassis is installed
correctly. For complete installation instructions, refer to the Dell PowerEdge FX2 server chassis
Installation Guide.
• AC/DC power cord — The cord reaches from the power outlet to the Utility-panel connector.
• Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines, and fluorescent lighting fixtures.
• Airflow — The airflow around the switch and through the vents is unrestricted.
Unpacking the Aggregator
When unpacking the Aggregator, ensure that the following items are included:
• One FN I/O Aggregator
• One USB type A-to-DB-9 female cable
• Getting Started Guide
• Safety and Regulatory Information
• Warranty and Support Information
• Software License Agreement
Unpacking Steps
NOTE: Before unpacking the Aggregator, inspect the container and immediately report any
evidence of damage.
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
8
Installation