Figure 10: replacing the power supply – Dell PowerEdge Rack Enclosure 4220 User Manual
Page 11
Cable Routing Procedures for Dell™ PowerEdge™ R510 Systems
Page 9
Figure 10: Replacing the Power Supply
Section 4: Cabling a PowerEdge™ R510 System Installed in Static Rails
NOTE: The CMA is compatible with the sliding rails only, not the static rails.
1. Follow the instructions contained in the Rack Installation Instructions found in the static rail kit to
install the server into a two-post or four-post rack.
2. Install the hook and loop straps provided in the rail kit through the slots in the rear brackets of the
rails as described in the Rack Installation Instructions.
3. Connect all applicable cables to the rear of the system and verify that all connections are secure.
4. Using the hook and loop straps, bundle the cables and secure them to either the left rail or right
rail as described in the Rack Installation Instructions. See Figure 11 for an example showing data
cables secured to the rail on the rear left side and power cables secured to the rail on the rear
right side.
Figure 11: Cabling a System Installed in Static Rails