beautypg.com

Installing the switch in the rack – Dell PowerVault 51F (8P Fibre Channel Switch) User Manual

Page 23

background image

Rack Installation Guide

1-7

+#

To install the switch in the rack, perform the following steps:

1.

Extend both intermediate slides forward until they lock in the extended position.

2.

At the front of the rack, carefully align the switch’s inner-slide rails with the inter-
mediate slides.

Slide the inner-slide rails into the intermediate slides, as shown in Figure 1-6.
Press the green button on the outside of each intermediate slide so that the
switch slides to the middle position. Press the green button again so that the
switch slides to its final position and locks in place.

+'$$(,

3.

Make sure that there is no gap between the manifold and switch.

4.

Tighten the eight 10-32 x 1/2-inch screws that attach the outer slides to the rack.

5.

Tighten the two thumbscrews on the bezel to keep the switch and slide assem-
bly from sliding out of the rack.

The thumbscrews pass through the holes in the rack and into the middle holes of
the stationary brackets.

inner-slide rail

outer slide

bezel

switch

manifold

thumbscrews (2)

green button

intermediate slide

4939tbk1.book Page 7 Friday, October 8, 1999 1:22 PM

This manual is related to the following products: