beautypg.com

Installation step 2, Install the header bracket – B&D N1134 User Manual

Page 14

background image

14

INSTALLATION STEP 2

Install the Header Bracket

WALL HEADER BRACKET INSTALLATION

• Centre the bracket on the vertical guideline with the

bottom edge of the bracket on the horizontal line
(with the arrow pointing toward the ceiling).

• Mark all of the bracket holes. Drill 4.5mm (3/16")

pilot holes and fasten the bracket with wood
screws. For concrete mount, use concrete anchors
provided.

Lag Screw
8mm x 40mm

Anchors
8mm x 40mm

HARDWARE SHOWN ACTUAL SIZE

Lag Screws
8mm x 40mm

Highest Point of
Garage Door Travel

Vertical
Center Line

Header
Wall

Garage
Door

UP

CEILING MOUNT ONLY

Wall Mounting Holes

Optional
Wall Mounting Holes

The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.

UP

CEILING MOUNT

ONL

Y

Door Spring

Header

Bracket

25mm
Board

Vertical
Center Line

Bracket Holes

Bracket Holes

50mm

(2")

25mm
Board

Header
Wall

Vertical
Centre Line

Lag Screws
8mm x 40mm

Header

Bracket

Highest Point of
Garage Door Travel

Vertical
Centre Line

Garage
Door

UP

CEILING MOUNT ONLY

Ceiling Mounting Holes

The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.

UP

Lag Screws
8mm x 40mm

Garage Door

Vertical Centreline

Header Wall

– Finished Ceiling –

Header

Bracket

15cm Maximum

Vertical
Centreline

Door
Spring

Bracket Holes

Bracket Holes

150mm

(6")

Door
Spring

Header Wall

Lag Screws
8mm x 40mm

Header

Bracket

Vertical Centreline

– Finished Ceiling –

CEILING HEADER BRACKET INSTALLATION

• Extend vertical guideline onto the ceiling.

• Centre the bracket on the vertical mark no more

than 150mm (6") from the wall. Make sure the
arrow is pointing toward the wall.

• Mark all of the bracket holes (5). Drill 4.5mm (3/16")

pilot holes and fasten the bracket with wood
screws. For concrete ceiling mount, use concrete
anchors provided.

114A2845