Great Plains 1205NT Operator Manual User Manual
Page 42

1205NT
150-131M
3/28/12
40
Single/Dual Markers without Sequence Valve
Refer to Figure 2.
1.
Fold markers manually into transport position
when charging hydraulic system for the first
time.
2.
Disconnect cylinder pin (1) from rod end of
cylinders and marker link arms (2). Swing
marker link arm up and out of the way.
3.
Connect hoses to tractor remote hydraulic
outlets.
4.
Loosen hose hydraulic fittings at rod end of
marker cylinders (3).
5.
With tractor at idle speed, slowly work tractor
remote lever in the direction which would re-
tract the cylinder.
NOTE: Do not try to retract cylinder. The goal is to
push air from the lines leading to the cylinder. The
position of the sequence valve determines which
cylinder will react first.
6.
When the air is expelled, oil will seep out
around a loosened fitting. Tighten the hose fit-
ting.
7.
Move tractor remote lever to fully extend cyl-
inder and hold for a few seconds.
8.
If you have dual markers, repeat steps 4
through 6.
9.
When the system is bled, move the tractor re-
mote to fully extend marker cylinders.
10. Reconnect cylinders to marker link arms.
Figure 2
Bleeding Marker Hydraulics
14021
- 1200 Parts Manual (210 pages)
- 706NT Material Rate (46 pages)
- 706NT Material Rate (50 pages)
- 2N-2410 Operator Manual (48 pages)
- 2N-2410 Operator Manual (56 pages)
- 12 Series Drills Assembly Instructions (6 pages)
- X-PresS 2006 Assembly Instructions (50 pages)
- TM500 Operator Manual (62 pages)
- 2010HDP Operator Manual (166 pages)
- YP1630F Material Rate (42 pages)
- YP2425 Operator Manual (162 pages)
- 3S-5000 Operator Manual (94 pages)
- 3PYP Operator Manual (188 pages)
- 3N-3010P Assembly Instructions (2 pages)
- 3N-3010 Assembly Instructions (9 pages)
- 3N-3010P Assembly Instructions (9 pages)
- PFH-15 Predelivery Manual (23 pages)
- PFH-15 Operator Manual (46 pages)
- PFH-15 Operator Manual (26 pages)
- P15126 Serial No 12724 (34 pages)
- DVN 8321 Operator Manual (38 pages)
- 3P500 Assembly Instructions (22 pages)
- 605NT Assembly Instructions (8 pages)
- 605NT Assembly Instructions (4 pages)
- 3P600 Assembly Instructions (12 pages)
- CPH-12 Assembly Instructions (3 pages)
- YP1625A-2420 24 Row 20-Inch Quick Start (6 pages)
- 8323 FCF Predelivery Manual (124 pages)
- P13937 (20 pages)
- 3323 DH Parts Manual (114 pages)
- YP3025-1820 25 Series 18 Row 20 Inch Quick Start (5 pages)
- CF500 Operator Manual (38 pages)
- PFH-15 Assembly Instructions (30 pages)
- 3500TM Parts Manual (106 pages)
- 1800TM Parts Manual (158 pages)
- YP2425A-2470 24 Row 70 cm Quick Start (5 pages)
- Simba Culti Press Operator Manual (38 pages)
- RU1999 Parts Manual (58 pages)
- 3N-30P Assembly Instructions (10 pages)
- 2510HDP Operator Manual (180 pages)
- YP1220 Parts Manual (136 pages)
- 3P500 Material Rate (68 pages)
- YP2425-3620 36 Row 20 Inch Quick Start (5 pages)
- 706NT Operator Manual (22 pages)
- 706NT Operator Manual (53 pages)