Reel following rolling harrow (optional) – Great Plains 1500TM Predelivery Manual User Manual
Page 19
Great Plains Manufacturing, Inc.
Assembly
15
12/12/2013
586-535Q
Reel Following Rolling Harrow (optional)
Note: It is very important to install the reel assembly in
the order shown below and go to the rolling harrow
placement drawing, see “Layout Section” of this
manual for proper dimensions where it is marked
xxx in drawing below. The reel arm assemblies
dimensions are coming off of rear tube of drag
frame to side of plate of reel arm assemblies
.
The reel tube assemblies
are dimensioned off
of end of reel tube to side of plate on reel arm
assembly
(dimensions in layout drawings may
come off either end of tube). For complete parts
breakdown see “Attachment Section” of Parts
Manual.
Refer to Figure 15
52. Install mounting reel arm assemblies
in position
shown in reel following rolling harrow placement
drawing with 5/8 x 3 1/32 x 4 1/2 u-bolts
, 5/8 lock
washers and 5/8 nuts. Torque u-bolts to 150ft-lb.
53. Attach reel tube assemblies
in direction shown in
circle and place them in position shown (with arrow
towards machine) with 5/8 x 2 17/32 x 3 1/2 u-bolts
, secure with 5/8 lock washers and 5/8 nuts.
Torque u-bolts to 150ft-lb.
54. Check to see that all bolts have been tightened to
specs, See “Torque Values Chart” on page 19.
1
1
3
1
1
2
3
4
3
4
1
Figure 15
Reel Following Rolling Harrow
43236
2