Assembly, Valves, Hose routing – Great Plains 1500TM Predelivery Manual User Manual
Page 12: Valves hose routing
586-535Q
12/12/2013
8
1200-1500TM
Great Plains Manufacturing, Inc.
Assembly
Valves
Note: Bolts needed in these next steps will be bolted on parts
or located in a bag on center frame. The hoses will be
hooked to valves and cylinders and hoses running to
hitch will be rolled up on center frame. The system will
be charged. Once hitch assembly is installed hoses will
need routed on hitch, see Hose Routing below
Refer to Figure 5
17. Install the counter balance valve
to block on center
frame with 5/16 x 3 1/2 hex bolts
and 5/16 lock wash-
ers.
18. Align holes in double block tee
in position shown,
secure with 5/16 x 4 bolts
, 5/16 lock washers and 5/16
nuts.
19. Install the lock valve
to the top of the bracket on center
frame with 1/4 x 2 Gr. 5 hex bolts
, 1/4 lock washers
and 1/4 nuts.
20. Bolts may be tightened to specs, See “Torque Values
Hose Routing
Refer to Figure 6
Note: Be sure hoses running from valves
to cylinders are
routed as shown before installing trusses
. The hos-
es need to route in locations shown with arrows, on top
of center frame tubes
to cylinders.
3
4
5
U
D
F
B
L
R
6
Figure 5
Valves
42943
1
2
1
2
3
4
5
6
2
1
Figure 6
Hose Routing
43124
3
2
3
1
2
3