Section 1: assembly, Center frame, torque tube & transport assembly, Section 1 assembly – Great Plains 6324DV Operator Manual User Manual
Page 16: Assembly

Section 1: Assembly
Great Plains Mfg., Inc.
Series VII 5110-6324 Discovator 550-220M
6/10/2004
14
Assembly
This section covers the proper assembly of the implement. The reference numbers on the
figures give you an indication of the order of assembly. For a complete breakdown of any part not
shown in this assembly section, refer to the parts manual for proper location. Refer to the Appendix
for proper bolt torque values.
Center Frame, Torque Tube & Transport Assembly
After uncrating the machine, place the
center frame (1) Figure 1, in the center of your
work area on stands. Pin the torque tube (2) to
the center frame with the 1 1/4 x 6 pins (3) and
1 1/4 x 7 pin (4) in center. Secure them with
3/8 x 2 1/4 Gr. 8 hex bolts (5) & lock nuts.
Slide the spindle of the center transport
(6) into the sleeve at the end of the torque tube
wheel arm (see section 3 for your model). It is
a good idea to put some form of anti-seize on
the spindle before you insert it. Line up the
hole in the spindle with the hole in the sleeve
and secure with 5/16 x 3 clevis pin (7) secure
with 1/8 x 1 cotter.
When both transport spindles/walking
beams have been installed, bolt on the center
transport tires (8), using 1/2” lug bolts or 1/2”
lug nuts (9). See Section 3 Replacement Parts
for proper transport parts and sizes for your
machine model.
Figure 1
11/22/2004